Services
Central Kitchen Bibb County Board of Education
This facility was constructed to consolidate the majority of the cooking for the entire school system to one location. Greene & Associates, Inc. performed the plumbing and process piping for this facility, including three (3) grease waste systems with 2-3000 gallon grease traps and 1-4000 gallon grease trap. A 100 horsepower steam boiler serves the facility along with compress air, process water and process chill water.
Client: Piedmont Construction Group Macon, GA
Contact: Donald Wigley (478)405-8907
Architect: Adams & Day, Macon, GA
Contract Amount: $577,857.00
Central High School
A new 205,000 square foot high school constructed immediately adjacent to the existing high school. Greene & Associates, Inc. performed the plumbing on this project, completing the entire project in 16 months.
Client: Gilbane Building Company
Contact: Josh Billings (678)282-1300
Architect: Dunwoody Beeland, Macon, GA
Contract Amount: $1,029,314.00
Munroe Science Center Wesleyan College
Greene & Associates, Inc. performed the plumbing and HVAC systems for this project. This was a new 40,000 square foot state of the art college lab facility with systems such as air, natural gas, deionized water and acid waste. HVAC systems include a 220 ton chiller, hot water heat, heat recovery loop, and Phoenix air valves to control air into and our of approximately 40 hoods throughout the facility.
Client: Whiting Turner, Atlanta, GA
Contact: Jennifer Dunn, (770)955-9300
Architect: Lord Aeck Sargent, Atlanta, GA
Contract Amount: $2,134,059.00